HighWater Utilities

Water meter replacement and OPWC funding

Stow wants to replace its aging water meters citywide with a connected smart-meter system, funded by a $4.1 million, 0% OPWC loan. Old meters that don't send readings mean lost water revenue. Residents raised privacy and radiation concerns, but no opt-out is planned.

2 mentionsLast discussed Sep 24, 2026
HighWater Utilities

Summit County Pump Station No. 19 replacement (Wyoga Lake)

A 61-year-old sewer pump station near Wyoga Lake failed in 2023 and has been limping along on salvaged parts while the county's replacement project has dragged since 2015. Residents fear a second failure could send sewage into homes, the lake, and downstream into the Cuyahoga River. The county now says construction could start in mid-2027.

2 mentionsLast discussed Sep 24, 2026
HighWater Utilities

Stormwater detention study

The city wants to know if two parcels it owns — on Hibbard Drive and Maplewood — can be turned into detention basins to reduce downstream flooding. E.L. Robinson Engineering would study it for up to $56,472 from the storm water fund.

2 mentionsLast discussed Aug 6, 2026
HighWater Utilities

THM removal system contract at City Center water tower

Council approved year five of a contract to keep removing trihalomethanes (disinfection byproducts) from Stow's water.

2 mentionsLast discussed May 14, 2026
HighWater Utilities

Water Department GIS and Leak Detection Tools

The Water Department got a GIS services contractor and new leak detection/line location equipment to find and fix water line problems faster.

3 mentionsLast discussed Feb 26, 2026
HighWater Utilities

Homewood and Echo Road Storm Improvements

Council authorized bidding for stormwater projects on Homewood ($300,000 budgeted) and Echo Road to fix drainage problems.

2 mentionsLast discussed Feb 26, 2026
HighWater Utilities

King Drive water line replacement

A resident reported roughly 45 water line breaks on King Drive and asked if replacement is planned. The city says the project is on the list, waiting for funding.

2 mentionsLast discussed Feb 12, 2026
HighWater Utilities

Rising emergency waterline repair costs

The contract for emergency water main break repairs with M Campbell Contracting rose to $150,000, driven by more breaks on aging pipes and extreme temperature swings — a sign of growing infrastructure strain.